JRP was appointed to carry out the upgrading of MAS Building to achieve GM Platinum as well as to meet the requirements of the organizations for the future years. The major M&E systems, including water-cooled chillers, AHUs, HT and LT electrical systems were replaced and upgraded. The tenanted office space within the building (in excess of 200,000 sq ft) was re-stacked with new layouts